PUBLIC METHODOLOGY RECORD · NATIVE TECHNICAL REPORTS

EXPERT TECHNICAL EDITION

SOL: enchant

PEI · E² · MPM · EMSQT · FULL FRAMEWORK DISCLOSURE

NATIVE ANALYTICAL RECORD · BASELINE 2026-07-04

SOL: enchant — Native Decision Architecture

Five English-language technical reports preserve the progression from a bounded 100-hour time-window analysis and MDML 4.0 perception terrain to the canonical eight-step operating loop, one qualified Godship Fair-Participation & Reentry Trust bottleneck and the reversible Predeclared Loss · Return Rule Contract. Each stage retains its own method, evidence boundary and decision right.

E · EVIDENCE REGISTERE² TIME-WINDOW EXPERIENCE EVIDENCE REPORT

Issue 2026-07 · one 100-hour analysis window · five windows · six value-contract lenses

T · STRATEGIC DIRECTIONPREDECLARED LOSS · RETURN RULE CONTRACT DESIGN REPORT

Issue 2026-07 · immutable core · symmetric six-surface coexistence · read-only / zero-writer

ANALYTICAL FRAMEWORK ARCHITECTURE

PEI → E² → MPM → EMSQT

PEI supplies company-level game interpretation; E² structures one 0–100h analytical frame through five windows and six value-contract lenses with disclosed simulation-supported fill; MPM carries the source report's MDML 4.0 structured assessment; EMSQT converts the record into an eight-step structural map, the CT-01 diagnostic lock and a symmetric six-surface rule-only design portfolio.

PEIPEI DIRECT-PLAY EXPERTISE

Interpret play before formalizing evidence

Establishes the system context, player task logic, and expert reading required to distinguish designed friction from a decision-relevant failure.

0–100H ANALYSIS FRAME · 5 WINDOWS · 6 VALUE-CONTRACT LENSES · SIMULATION-SUPPORTED FILL

Register experience across time

Structures direct observation into time-windowed evidence, tracking friction, passage quality, and changes in the governing value contract.

MPMMDML 4.0 · 2 AREAS · 6 DOMAINS · 18 FIELDS · 54 ELEMENTS · 7 VDC

Measure perception without flattening variance

Separates modeled value, dispersion, and validation pressure. Every reading remains governed by evidence grade, variance, and its declared confirmation boundary.

EMSQTFIVE DISTINCT DECISION RIGHTS

Convert evidence into decision architecture

Progresses from evidence and evaluation through structure, diagnosis, and strategy while preserving the authority and boundary of every stage.

FULL METHODOLOGY DISCLOSURE

Native Framework Code Register

Every stage exposes the canonical analytical system used to produce its judgment. Framework names and report-level codes are public; internal file paths and production administration remain outside the analytical record.

EEXPERIENCE EVIDENCE

E² PROTOCOL

ONE 100-HOUR ANALYSIS FRAME · 5 WINDOWS · 6 VALUE-CONTRACT LENSES

MPERCEPTION EVALUATION

MDML 4.0 · MPM

2 AREAS · 6 DOMAINS · 18 FIELDS · 54 ELEMENTS · 7 VDC

SSTRUCTURAL LOCALIZATION

SFA · S1–S10

5 AREAS · CANONICAL 8-STEP LOOP · 9 UNRANKED CANDIDATES

QBOTTLENECK QUALIFICATION

M-ABC · TVW

CT-01 · CORE 1 · SECONDARY 5 · VALIDATION FIRST 7 · GUARDRAILS 6 · ASSETS 7

TOPTIMIZATION DESIGN

RULE-ONLY · ZERO-WRITER

CORE 1 + ATTACHMENT 5 · NATURAL 0 · PARTIAL 1 · LIVE 4 · SIGNATURE 0/0 · R0–R4

00 · AUTHORITATIVE REPORT ATLAS

Select the stage report required for the decision at hand.

E01
AVAILABLE

E² TIME-WINDOW EXPERIENCE EVIDENCE REPORT

Issue 2026-07 · one 100-hour analysis window · five windows · six value-contract lenses

VERDICT
SOL: enchant establishes strong entry value through automated growth, offline continuity, Nine-linked exchange and visible Godship status. Pressure migrates from first growth and summon interpretation to routine, completion, loss, recovery and authority-return legibility; E records that migration without selecting a cause or solution.
BASELINE
2026-07-04
NATIVE EOPEN →
M02
AVAILABLE

MDML 4.0 PERCEPTION AND INVESTMENT REPORT

Issue 2026-07 · 2 areas · 6 domains · 18 fields · 54 elements · six value-contract lenses · 7 VDC

VERDICT
Graphic, Growth Provision and Growth Need are the highest modeled fields at 80.95, while Gacha 40.48, Fairness 51.32 and Event 57.14 are the clearest trust gates. The terrain is a structured model assessment, not an official KPI, participant study or customer behavior result.
BASELINE
2026-07-04
NATIVE MOPEN →
S03
AVAILABLE

SFA STRUCTURAL SYSTEM REPORT

Issue 2026-07 · five operating areas · canonical eight-step loop · nine unranked candidates

VERDICT
SOL: enchant closes an eight-step operating loop from fixed rules through growth supply and conversion, economy, competition and cooperation, product and operations, LiveOps reinjection and core return. Nine structural candidates remain unranked junctions; none is a qualified bottleneck or approved design.
BASELINE
2026-07-04
NATIVE SOPEN →
Q04
AVAILABLE

M-ABC BOTTLENECK QUALIFICATION REPORT

Issue 2026-07 · CT-01 · core 1 · secondary 5 · Validation First 7 · guardrails 6 · protected assets 7

VERDICT
CT-01 locks Godship Fair-Participation & Reentry Trust as the single core bottleneck. When competition score, loss, recovery and authority-return rules meet spending concentration, trust in fair participation and post-loss reentry is compressed. Five secondary tracks retain independent junctions; seven other candidates remain Validation First and are not promoted.
BASELINE
2026-07-04
NATIVE QOPEN →
T05
AVAILABLE

PREDECLARED LOSS · RETURN RULE CONTRACT DESIGN REPORT

Issue 2026-07 · immutable core · symmetric six-surface coexistence · read-only / zero-writer

VERDICT
The immutable core is the Predeclared Loss · Return Rule Contract: one rule version and one reversible guard declare L1 loss rule, L2 recovery condition and L3 authority return before action. Five attachments retain separate canonical sources, owners, off-switches and rollback boundaries. All selected variants remain conservative or balanced; downgrade count is zero.
BASELINE
2026-07-04
NATIVE TOPEN →
REPORT PROTOCOL

00 is a routing atlas, not a composite score. E, M, S, Q, and T are independent reports with separate analytical questions, evidence boundaries, and decision authority.