PUBLIC METHODOLOGY RECORD · NATIVE TECHNICAL REPORTS

EXPERT TECHNICAL EDITION

AION 2

PEI · E² · MPM · EMSQT · FULL FRAMEWORK DISCLOSURE

NATIVE ANALYTICAL RECORD · BASELINE 2026-05-07

AION 2 — Native Decision Architecture

Five English-language technical reports preserve the progression from bounded growth-economy evidence to one qualified Growth Trust Transition Gap and the reversible Removable Growth Contract Overlay. Each stage retains its own method, evidence boundary and decision right.

E · EVIDENCE REGISTERE² EXPERIENCE EVIDENCE REPORT

Issue 2026-06 · five analytical windows · six value contracts · named-system evidence · confirmation coordinates

T · STRATEGIC DIRECTIONREMOVABLE GROWTH CONTRACT OVERLAY DESIGN REPORT

Issue 2026-07 · RULE-ONLY · core 1 + companion 5 · symmetric six-contract portfolio · reversible validation

ANALYTICAL FRAMEWORK ARCHITECTURE

PEI → E² → MPM → EMSQT

PEI supplies company-level game interpretation; E² structures the 0–100h analytical frame through five windows and six value contracts; MPM carries the source report's MDML 4.0 perception assessment; EMSQT converts the record into an eight-step structural map, the CT-01 diagnostic lock and a symmetric six-contract rule-only design portfolio.

PEIPEI DIRECT-PLAY EXPERTISE

Interpret play before formalizing evidence

Establishes the system context, player task logic, and expert reading required to distinguish designed friction from a decision-relevant failure.

0–100H ANALYSIS FRAME · 5 WINDOWS · 6 VALUE CONTRACTS · 7 EVIDENCE THEMES

Register experience across time

Structures direct observation into time-windowed evidence, tracking friction, passage quality, and changes in the governing value contract.

MPMMDML 4.0 · 2 AREAS · 6 DOMAINS · 18 FIELDS · 54 ELEMENTS · 6 VALUE CONTRACTS

Measure perception without flattening variance

Separates modeled value, dispersion, and validation pressure. Every reading remains governed by evidence grade, variance, and its declared confirmation boundary.

EMSQTFIVE DISTINCT DECISION RIGHTS

Convert evidence into decision architecture

Progresses from evidence and evaluation through structure, diagnosis, and strategy while preserving the authority and boundary of every stage.

FULL METHODOLOGY DISCLOSURE

Native Framework Code Register

Every stage exposes the canonical analytical system used to produce its judgment. Framework names and report-level codes are public; internal file paths and production administration remain outside the analytical record.

EEXPERIENCE EVIDENCE

E² PROTOCOL

5 WINDOWS · 6 VALUE CONTRACTS · 7 THEMES · CONFIRMATION COORDINATES

MPERCEPTION EVALUATION

MDML 4.0 · MPM

2 AREAS · 6 DOMAINS · 18 FIELDS · 54 ELEMENTS · 6 VALUE CONTRACTS

SSTRUCTURAL LOCALIZATION

SFA · S1–S10

5 DOMAINS · 8-STEP CORE LOOP · 4 SUPPORT LOOPS · 8 UNRANKED CANDIDATES

QBOTTLENECK QUALIFICATION

M-ABC · TVW

CT-01 · CORE 1 · SECONDARY 5 · 14-CANDIDATE REGISTER · PROTECTED ASSETS 9

TOPTIMIZATION DESIGN

RULE-ONLY

CORE 1 + COMPANION 5 · NATURAL RESOLUTION 0 · REDUCED 3 · INDEPENDENT 2 · R0–R4

00 · AUTHORITATIVE REPORT ATLAS

Select the stage report required for the decision at hand.

E01
AVAILABLE

E² EXPERIENCE EVIDENCE REPORT

Issue 2026-06 · five analytical windows · six value contracts · named-system evidence · confirmation coordinates

VERDICT
AION 2 establishes strong value through manual combat, eight class identities, open-world exploration, active farming and Abyss competition. Evidence pressure develops when enhancement, Arcana, Pet Growth, Equipment Potential, Kinah and Abyss Points begin to require the six value contracts to reconstruct cost, completion, fairness and the next meaningful goal from separate surfaces.
BASELINE
2026-05-07
NATIVE EOPEN →
M02
AVAILABLE

MDML 4.0 PERCEPTION AND INVESTMENT REPORT

Issue 2026-06 · Provider x Customer · 6 domains · 18 fields · 54 elements · Time / Money / Passion

VERDICT
In the structured player-perspective model, Competition and Growth need are the strongest perceived-value fields at 81.48, while Growth provision at 81.22 and Stability at 80.16 supply a durable value base. Actual Benefit at 62.96, Probability and Reward Management at 63.62, and Fairness at 64.81 are the priority trust-gate candidates for interpreting whether accepted value may become further Time, Money or Passion.
BASELINE
2026-05-07
NATIVE MOPEN →
S03
AVAILABLE

SFA 10-SYSTEM STRUCTURAL REPORT

Issue 2026-06 · five operating domains · eight-step core loop · four support loops · eight unranked candidates

VERDICT
AION 2 runs as an eight-step progression circulation: basic standard lock, active repeat growth, progression asset accumulation, competition and cooperation validation, economy management, revenue and monetization conversion, live operations reactivation, and core return and re-entry. The loop closes, but its shared progression asset can transmit access, endgame supply, competition, social-content, post-cap motivation, market, business-model and event-freshness tension across multiple systems.
BASELINE
2026-05-07
NATIVE SOPEN →
Q04
AVAILABLE

M-ABC BOTTLENECK QUALIFICATION REPORT

Issue 2026-07 · E-M-S convergence · diagnostic lock · core 1 · secondary 5 · complete candidate register

VERDICT
CT-01 qualifies the Growth Trust Transition Gap as the single core bottleneck. From the 20-60h transition into the long-run contract, Enhancement, Arcana, Pet Growth and Equipment Potential combine mastery and ownership value with probability, repeated cost, completion rules and long-horizon pressure, weakening the conversion from effort to predictable progress and a trusted next goal.
BASELINE
2026-05-07
NATIVE QOPEN →
T05
AVAILABLE

REMOVABLE GROWTH CONTRACT OVERLAY DESIGN REPORT

Issue 2026-07 · RULE-ONLY · core 1 + companion 5 · symmetric six-contract portfolio · reversible validation

VERDICT
The recommended core is the Removable Growth Contract Overlay: a read-only hierarchy that aligns requirement, result, actual cost, protection, completion and next objective while leaving native execution, settlement and return unchanged. Five companion contracts retain competition, purchase, routine, control and governance at their own sources; no track is absorbed into the core.
BASELINE
2026-05-07
NATIVE TOPEN →
REPORT PROTOCOL

00 is a routing atlas, not a composite score. E, M, S, Q, and T are independent reports with separate analytical questions, evidence boundaries, and decision authority.